Войти
  • 1604979Просмотров
  • 3 месяца назадОпубликованоDmitry Lukin

511 Days Building My Dream House. From Start to Finish, Step by Step in One Video

00:00:00 - 1. INSULATED SWEDISH FOUNDATION 00:00:04 - Laying of sewer pipes 00:01:48 - Insulated permanent formwork 00:04:40 - Insulation of the foundation from below 00:07:53 - Cold and hot water pipes 00:09:24 - Underfloor heating (house heating) 00:11:20 - Pipes for electrical wires 00:12:42 - Sewer exits 00:13:07 - Reinforcement of the foundation 00:13:52 - Mortgages for fixing the terrace 00:15:37 - Lighthouses for leveling concrete 00:16:27 - Formwork supports 00:17:08 - Crimping of the underfloor heating system 00:17:41 - Preparation for pouring concrete 00:18:54 - Pouring concrete 00:21:05 - Insulated blind area of the foundation 00:21:53 - 2. THE FIRST FLOOR IS MADE OF AERATED CONCRETE 00:22:17 - The first row of masonry 00:23:49 - The second row of masonry 00:24:32 - Reinforcement of window sills 00:25:55 - Masonry of external walls with adhesive foam 00:30:38 - Interior wall masonry 00:31:36 - Formation of a hole under the chimney of the fireplace in the corner 00:33:03 - Ordinary lintels over doorways 00:34:00 - Aerated concrete column (floor support with electrical corrugations inside) 00:35:24 - Production of U-blocks 00:36:09 - Installation of window openings 00:40:14 - Manufacture and installation of armopoyas blocks 00:43:31 - Reinforcement and filling with cement-sand mixture 00:45:10 - 3. TERRACE 00:45:11 - Terrace piles 00:45:55 - Tying piles with a board 00:46:28 - Fixing the board to the foundation with the help of mortgages 00:47:46 - The frame of the terrace 00:50:15 - 4. OVERLAP 00:50:16 - Tying the walls with a board 00:51:20 - Beams made of 145*195mm timber 00:51:39 - Beams made of board 45*195mm 00:55:33 - Cladding with 18mm OSB plates 00:57:21 - 5. THE FRAME OF THE SECOND FLOOR 00:57:53 - Assembly of the side walls of the second floor 00:59:32 - Lifting of the side walls of the second floor 00:59:49 - Preparation of parts and assembly of pediments 01:03:49 - Interior walls of the second floor 01:05:05 - 6. OPEN ROOF TRUSS SYSTEM 01:05:06 - Beams made of 145*195mm timber for supporting rafters 01:06:26 - Manufacture and installation of a rafter system 01:08:25 - The result of the work 01:08:32 - Interior planking along the rafters (open rafter system) 01:09:58 - 7. POWERFUL ROOF INSULATION 01:09:59 - Vapor barrier 01:10:19 - Hemming the roof overhangs with a planed board 01:11:34 - Dobs made of 50*150mm board 01:12:40 - Roof insulation with 150mm polyisocyanurate 01:16:04 - 8. ROOF AND SKYLIGHTS 01:16:11 - Installation of a 22*100mm board crate 01:17:36 - Openings for skylights 01:18:37 - Cladding with 12mm OSB plates 01:20:52 - Installation of the skylight 01:00:00 - Waterproofing with lining carpets for flexible tiles (self-adhesive and mechanically fixed) 01:22:19 - Waterproofing of the skylight 01:24:48 - The second roof slope 01:27:48 - Cornices and balconies 00:30:17 - Installation of flexible bitumen shingles 01:33:11 - Waterproofing of the skylight 01:41:01 - Ventilation of the under-roof space 01:44:18 - 9. DRAINAGE SYSTEM 01:44:19 - Installation of gutter brackets 01:45:53 - Installation of gutters 01:47:55 - Installation of downpipes 01:52:21 - 10. FILLING AROUND THE HOUSE 01:53:38 - 11. INSULATION OF THE SECOND FLOOR 01:53:39 - Vapor barrier of the walls of the second floor 01:54:34 - Insulation of 100mm polyisocyanurate 02:01:18 - 12. BALCONIES 02:01:19 - Formation of a slope for water drainage 02:03:08 - Waterproofing of balconies 02:05:24 - Wooden window quarters 02:06:34 - 13. MARBLE FACADE FINISHING 02:06:35 - Preparation of the walls 02:07:32 - Installation of facade finishing based on marble chips 02:22:30 - Removing the protective film 02:26:04 - Waterproofing of window openings 02:26:26 - 14. FACADE DECORATION WITH WOOD 02:26:27 - Preparation of details 02:27:16 - Facade cladding with wood (spruce plank) 02:31:16 - Window and door trim 02:33:39 - Decorative elements made of wood 02:43:24 - 15. ELECTRICAL INSTALLATION 02:43:25 - Installation of desoldering boxes 02:43:46 - Laying wires for lighting 02:43:53 - Connecting wires 02:44:29 - THE FRONT DOOR 02:44:30 - Waterproofing of the doorway 02:44:53 - Installation of the heating cable in the door box 02:45:20 - Filling the door box with foam 02:45:41 - Installation of the door frame in the opening 02:46:12 - Installation of the door leaf 02:46:34 - Window frames on the first floor 02:47:48 - 16. TERRACE AND BALCONY FLOORS 02:47:49 - Preparation of the decking 02:48:41 - Installation of the board on the terrace floor 02:51:14 - Finishing painting 02:52:09 - Floors on balconies 02:54:16 - 17. INSTALLING WINDOWS 02:54:17 - Installation of windows 02:55:48 - Window trim at the bottom 02:56:31 - Platbands on the corners of the second floor 02:56:54 - Sealing of window tides 02:57:46-18. FENCING OF TERRACES AND BALCONIES 02:58:01 - Terrace fencing 03:02:09 - Balcony fencing 03:05:11 - 19. INSTALLATION OF A SLIDING PORTAL 03:06:04 - 20. FACADE LIGHTING 03:07:05 - 21. RESULT