In today's video we finally finish off my massive home network install! We'll terminate all the patch panels, build out the rack and finally get the network fully up and running! Buy on Amazon (Affiliate): - Cable Crimp Tool & Terminals: - Labgear TV Distribution Amplifier: - F-Connector Crimp Tool & Connector Set: - Brother PT-E550W Label Printer: Other Products: - Horizontal Rack Bonding Busbar: Shielded Cable Bonding Technical Document: :// Chapters: 00:00 - Introduction 00:43 - Work Since Previous Video 03:08 - Installing Bonding Infrastructure 12:13 - Installing CAT 6A Patch Panels 21:23 - Installing speakON Speaker Patch Panel 25:21 - Installing TV Antenna Distribution System 30:19 - Installing Networking Equipment 32:28 - First Switch On! 33:14 - Completed Rack Walkthrough 42:06 - Working Network Faceplate! 43:33 - Conclusion *AFFILIATE LINKS NOTICE:* Product links under this video marked “(Affiliate)” are affiliate links where I may receive a small commission on qualifying sales. Affiliate programs that I am a member of include, _but are not limited to:_ Amazon Associates, eBay Partner Network and AliExpress Affiliates. As an Amazon Associate I earn from qualifying purchases. Purchasing through these affiliate links will not cost you any more money, however the commission earned significantly helps fund the production of videos on my channel.











